At this point I'd be shocked if it opened late 2024. They still have a lot of work to do. My guess is it'll get pushed into 2025.Have there been any updates on an opening date other than late 2024?
At this point I'd be shocked if it opened late 2024. They still have a lot of work to do. My guess is it'll get pushed into 2025.Have there been any updates on an opening date other than late 2024?
No - and usually DVD doesn't officially announce the opening date until just a short bit before it goes on sale. The hint that things are about to be announced is when point charts etc start to emerge, but there is still a lot of work to do so I don't expect any real updates before late summer IMO.Have there been any updates on an opening date other than late 2024?
Have there been any updates on an opening date other than late 2024?
The next major detail for the tower should be the timeshare license.Have there been any updates on an opening date other than late 2024?
So would that mean that it would technically open probably around 2025 then? Points on sale when then, more fall of this year? I hate the short notice and bombing of points charts and room designs/layouts just a few weeks before it goes on sale. I'm a long-term planner, dammit! LOL.The next major detail for the tower should be the timeshare license.
Here are some comparisons:
Assuming tower opens no later than December 2024:
- VGF1 - 1/20/13 declaration granted and opening date of 10/23/23. 276 days.
- PVB - 6/2/14 declaration granted and opening date of 4/1/15. 303 days.
- CCV - 9/6/16 declaration granted and opening date of 7/17/17. 314 days.
- RIV - 7/17/18 declaration granted and opening date of 12/16/19. 517 days.
- VGF2 - 7/16/21 declaration granted and opening date of 6/20/22. 339 days.
- VD - 8/8/22 declaration granted and opening date of 9/28/33. 416 days.
- CFW - 10/20/23 declaration granted and opening date of 7/1/24. 255 days.
- If tower is like CFW, could be up to 3 months.
- If tower is like the next shortest turnaround (VGF1), we should see something within 2 months.
- If tower is like PVB or all the other resorts, the declaration show up within the next month.
The best indicator of when they will be done is to watch any of the latest vlogs or search for pictures of construction progress. The tower is nowhere remotely close to being ready by the fall. It's still very much bare bones. As with most things Disney is building lately - it's taking a lot longer than expected. 2025 at the earliest would be my guess.So would that mean that it would technically open probably around 2025 then? Points on sale when then, more fall of this year? I hate the short notice and bombing of points charts and room designs/layouts just a few weeks before it goes on sale. I'm a long-term planner, dammit! LOL.
More importantly, if they do CFW open for sale 2/1 and booking 7/1, is there a possibility for it (Poly tower) to be open Thanksgiving this year since it falls really late, or you think "late 2024" means, like, 12/20ish? LOL.
I was thinking it would definitely be open by October/November to capitalize on the fall frenzy/Christmas season of folks buying points on vacation, but I can't get a fix on how long they'll take to do the interiors now that most of the basic framing seems to be done on the outside and they're digging the pools.
yup - with Cabins going on sale soon, I'm betting they are pushing Poly2 back to 2025 like you said .The best indicator of when they will be done is to watch any of the latest vlogs or search for pictures of construction progress. The tower is nowhere remotely close to being ready by the fall. It's still very much bare bones. As with most things Disney is building lately - it's taking a lot longer than expected. 2025 at the earliest would be my guess.
I hope you guys are right my wallet still needs to recover from my last RIV addonitis purchase and it being in 2025 may give me some more time to recover..yup - with Cabins going on sale soon, I'm betting they are pushing Poly2 back to 2025 like you said .
Hopefully it’s after August ‘25 so I can get double points when I buyI'm betting they are pushing Poly2 back to 2025
It doesn't have to be fully done for it to go on sale right? Even if it gets pushed to an early 2025 opening date (lets say march), they could put it on sale for like Nov 1 maybe?
Its 5 months from 2/1 sale open for CFW vs resort opening on 7/1.
Comparing this to VGF, when the new sales promos opened, were you restricted in time as to when you could first use the points? It seems like the available points to spend would be far more than availability until the new rooms actually open.
My guess is we wont see any new info regarding sales, pricing, opening date and official confirmation of the assocation in filed documents for a few more months....