5:45 AMExcited for all those riding today!! Thanks for your post and pics @eviane.
Does anyone know what time the Pop/AoA station opens?
5:45 AMExcited for all those riding today!! Thanks for your post and pics @eviane.
Does anyone know what time the Pop/AoA station opens?
ResortTV1 (youtube live stream) was just riding the Skyliner with someone from the company who built the Skyliner system. They confirmed a rumor about expanding the line but nothing was announced yet.
Take as you want but thought it fit the rumor category and was a little more reliable than a bus driver.
They totally should open earlier. Rope drop was impossible with 5:45am start times. After 6 for sure.Thanks for posting @evlaina! What was the total time from lining up at POP to arriving at HS? We are doing the same route a week from today. Wanting to rope drop though so am guessing we will need to catch a bus that morning to be in the front of the pack. Wish they opened 1/2 hour earlier!
imagineer
ResortTV1 is finishing their stream at Studios, the line heading back to CBR is out of the station down down the street long.
Not sure how "official capacity" that person was in today, but you'd think they would be mindful to go the other way and not even hint about it if it wasn't something definitely on the table
Not saying that means definitely happening or anything but probably more than just passing thought from one imagineer
They were not an imagineer (at least not that I gathered) they had on the logo'd polo from Doppelmayr. I couldn't hear exactly but it seemed they confirmed they worked for Doppelmayr not Disney (so less likely to worry about not leaking something).
Doppelmayr employees aren’t used to secrecy and tend to let the info fly pretty easily. I know a few of them. Additional lines have been planned, but that doesn’t mean they’ll happen.
Planned though is pretty far down the line of doing something. Yes they need to be allocated budget but when they see they can charge 20% more for these rooms I would suspect they will want more on the line to justify higher costs and also cut the more costly bus coverage likely.
Do you know what is planned by chance? Like is there phases or more importantly would a AKV to AK line be planned as possibly the next step?